Get A Demo

You're viewing eLogii for Field Service. Distribution business? Switch to Distribution →

Built for building materials distribution

Route Planning Software for Building Materials Distributors

Plan every load a building materials distributor runs - direct-to-site, into merchants and wholesalers, installer and showroom drops, home deliveries, same-day van runs and supplier backhauls - across mixed fleets of vans, rigids, curtain-siders, flatbeds, and HIAB, moffett and tail-lift trucks.

Worker in high-vis vest showing OSB plywood boards to a customer at a merchant floor
eLogii task list showing insulation foam and inox pipe building materials deliveries
Customer SMS preview for a building materials delivery with itemised contents and ETA
Live
Driver assignment card showing a 3.5t ADR van and capacity utilisation

TRUSTED BY BUILDING MATERIALS DISTRIBUTORS WORLDWIDE

Porcelanosa Brymec Stelrad Barwick Wedge Berkshire Tool Supply Group VJ Technology Likewise ATS Building Products Trimline

One platform for every load you run

Building materials distribution is rarely one-shape work. eLogii plans every job in your operation - planned and unplanned, big and small - in a single optimization.

Direct to site

Live construction sites, craned offloads, timed delivery windows and access rules.

Into merchants and wholesalers

Branch and DC drops to your customers' networks, with goods-in cut-offs respected.

Installer and showroom drops

Bathroom fitters, flooring installers, kitchen and tile showrooms, on appointment.

Trade and home delivery

Contractors' yards, small builders, and end-customer home deliveries with 2-hour windows.

Same-day and urgent van runs

Forgotten parts, samples and top-ups slotted into routes already on the road.

Backhauls, returns and empties

Supplier collections, damaged returns, cages and stillages on the same vehicle.

Does this sound like your operation?

The reality of running a 50+ vehicle building materials fleet on spreadsheets and tribal knowledge.

Vans and trucks planned in separate spreadsheets

Most tools handle either multi-drop vans or HGV trunking - not both. Your urgent van jobs and your planned routes never meet on the same screen.

HIAB, moffett and tail-lift assignment lives in someone's head

Planners guess whether a load is weight or volume constrained, and which vehicle has the right offload kit. One absence and the yard grinds to a halt at 7am.

Site windows, crane slots and access rules in email threads

"No deliveries before 9", "crane booked 10-11am", "tail-lift only" - the rules that decide whether a delivery succeeds aren't in the routing tool, so they aren't enforced.

Same-day urgent jobs land all day with nowhere to put them

A forgotten box of fixings, a sample run for a showroom, an emergency replacement to site - they bypass the plan and chew margin.

Drivers phoning sites because the ETA is a four-hour window

Site managers, branch goods-in, showroom managers and homeowners all want to know when. Without live tracking, your sales office becomes a switchboard.

PODs that don't hold up when porcelain or steel arrives chipped

A signed paper docket doesn't win the dispute. Photo, signature, geo-stamp and damage notes do.

Empties, cages and stillages stacking up on sites

Nobody planned the pickup. Now you're paying for replacements you already own.

Fuel, overtime and empty miles climbing quarter on quarter

No baseline, no optimization, no way to prove what a better plan would have saved.
Mixed Fleet Planning

Match the vehicle to the load - from a transit van to a HIAB rigid

Configure your fleet across vans, 3.5t, 7.5t, 18t and artic, with capabilities like HIAB, moffett, tail-lift, ADR and height limits. eLogii treats them as hard constraints so a same-day van run for a box of fixings, a pallet of porcelain on a tail-lift, and a craned offload of trunking on a HIAB rigid are each routed to the right vehicle - automatically.

Vans, rigids, artics in one fleet

Plan vans and HGVs together in one optimization, not two spreadsheets.

Vehicle types & capabilities

HIAB, moffett, tail-lift, curtain, flatbed, ADR - all configurable as hard constraints.

Weight, volume & dimensions

Capacity by weight and volume, plus length and height limits, in a single plan.

Driver skills & licenses

HIAB operator, ADR-trained, moffett-certified - assigned only to drivers with the right skill.
Operations map showing building materials routes with Moffett tail-lift and HIAB driver cards
Time Windows & Constraints

Plan site windows, merchant cut-offs, showroom slots and home delivery windows in one map

Every stop carries its own rules: construction site windows, craneage slots, merchant goods-in cut-offs, showroom appointments, 2-hour home delivery windows. eLogii's optimization engine solves them together so the plan is deliverable before a vehicle leaves the yard.

Time windows on every stop

From narrow site slots to 2-hour home delivery windows - all enforced as hard constraints.

Service durations & access notes

Per-customer service times and access rules built into every plan.

Multi-depot routing

DC, satellite yards and cross-docks in a single optimization across multiple days.

Multi-day & overnight routes

Trunking and long-distance runs planned across multiple shifts and depots.
Building materials truck driver at the wheel with route timeline and time-window task cards overlay
Live ETA & Customer Tracking

Give site managers, merchants, installers and homeowners a live ETA

Branded customer tracking links, live ETA updates, and configurable email, SMS and push notifications. Photo and signature capture on the driver app, with custom forms for damage, offload location and refusal reasons. The phone stops ringing. Disputes drop. Your sales office stops chasing.

Branded customer tracking links

Your logo, colors and sub-brands on every tracking page - one platform, many brands.

Email, SMS & push notifications

Configurable templates for site managers, merchants, showrooms and homeowners.

Live ETA updates

ETAs recalculate continuously as the driver progresses, pushed to customers automatically.

Driver app: photo, signature, forms

Photo POD, e-signature, barcode scan, damage notes and refusal reasons.
Branded customer tracking page showing live map and courier-on-his-way status
One Plan, Every Job

Direct delivery, multi-drop, urgent runs and backhauls in one plan

Planned multi-drop routes, same-day and ad-hoc van jobs, supplier backhauls and empties pickups - all in one optimization across multiple depots and multi-day routes. No separate spreadsheet for the urgent runs. Empty miles fall, drops per vehicle climb.

Same-day & dynamic dispatch

Slot urgent jobs into routes already on the road and push them straight to the driver app.

Pickups, backhauls & returns

Supplier collections, empties, cages and damaged returns planned on the same vehicle.

POD PDF, forms & checklists

Photo, signature, custom forms and POD PDF generated on every job.

Task rules & exception workflows

Automate dispatch, customer alerts, failure reasons, reattempts and returns.
Driver capturing signature on phone with returns form and task rules editor
+30%
More drops per vehicle across mixed van and HGV fleets
-50%
Planning time, with same-day jobs slotted in seconds
95%+
On-time delivery to site, merchant, showroom and home

"We needed to have full control of our transport and furthermore we wanted an easy way to be able to review the plan for a day and be sure that things were efficient. That vehicles were travelling out full, but that windows were also going to be hit and the customer always satisfied. This kind of visibility and control is vital for our operations."

Rafael Salinas
Rafael Salinas
Head of International Operations, Porcelanosa

What building materials distributors use most

The capabilities behind the four showcases above

Plugs into the stack you already run

eLogii integrates with Samsara for live vehicle telematics, location and driver behavior - so the plan you build is grounded in what your fleet is actually doing. Beyond Samsara, our class-leading REST API and webhooks connect eLogii to any ERP, WMS or e-commerce platform a building materials distributor runs, including Kerridge, Intact, Merlin, SAP, Microsoft Dynamics, Sage and Shopify. No middleware. No bespoke connector project. Live in weeks.

Frequently asked questions

Yes. eLogii is built for 50+ vehicle distribution fleets and is used by building materials distributors including Porcelanosa, Brymec, Stelrad, Wedge, Barwick, Berkshire Tool Supply Group, VJ Technology, Likewise Floors, ATS Building Products and Trimline. Multi-depot, multi-day and overnight routes are core to the platform.

Yes. Configure your fleet across vans, 3.5t, 7.5t, 18t and artic, with weight, volume and dimension constraints, and eLogii's optimization engine plans them together in one run. A same-day van job for a box of fixings, a tail-lift drop of porcelain and a HIAB-craned offload of trunking are each routed to the right vehicle.

Yes. Vehicle Types and Vehicle Capabilities are fully configurable, so HIAB, moffett, tail-lift, curtain-sider, flatbed, ADR and any other capability is treated as a hard constraint when assigning loads. Driver Skills and Schedule-based Driver Skills do the same for HIAB operators, ADR-trained drivers and moffett operators.

Every stop in eLogii carries its own time windows, service durations and constraints. Construction site windows, craneage slots, merchant goods-in cut-offs, showroom appointments and home delivery 2-hour windows are all solved together by the optimization engine before vehicles leave the yard.

Yes. eLogii supports route reoptimization for live routes, so urgent same-day van jobs can be slotted into a driver's run with one click and pushed straight to the driver app, with updated ETAs sent automatically to affected customers.

Yes. The eLogii driver app supports photo capture, electronic signatures, barcode scan, configurable forms for damage and offload notes, checklists, step confirmation and POD PDF generation. Failure reasons, return options and reattempt workflows are fully configurable.

Yes. eLogii's REST API and webhooks connect to any ERP, WMS or e-commerce platform a building materials distributor runs, including Kerridge, Intact, Merlin, SAP, Microsoft Dynamics, Sage and Shopify. No middleware required. We also integrate natively with Samsara for live telematics.

Yes. eLogii supports multi-depot, multi-day and overnight routes, with driver depot and return location setup so the right driver and vehicle start and end at the right site. Routes can be planned across multiple yards in a single optimization.

Most 50+ vehicle building materials distributors are live in weeks, not quarters. Our REST API and webhooks remove the need for middleware or a bespoke connector project, and our team supports data migration, integration and driver onboarding throughout.

Ready to plan your real day?

See a day of your real loads planned in eLogii

Send us last Tuesday's order book - site drops, merchant runs, installer drops, the urgent vans, the lot. We'll show you the routes, the vehicle mix and the drops per vehicle, against what you actually ran.